标志桩模具生产工艺原理
Production technology principle of mark pile mold
准备标志桩模具一个,震动平台一个,搅拌好的混凝土
Prepare a mark pile mold, a vibrating platform, a mixing concrete
将模具放置在平整的地面上,将混凝土灌入模具中,放在震动平台上震动片刻
Place the mold on the flat ground, pour the concrete into the mold, and vibrate on the vibrating platform for a moment
放置在避光避光的地方养护
Keep in a place where it is protected from light and light
夏季钢模具12小时,每天能脱两次模;冬季放置24小时,每天脱一次模;塑料模具夏季24小时;冬季48小时即可。
In summer, the steel mould can be removed two times every day for
12 hours. 24 hours in winter and a die every day. The plastic mould is
24 hours in summer and 48 hours in winter.
待水泥凝固后,自然脱落即可
After the cement is solidified, it falls off naturally