联系我们

公司名称:保定永久标志桩模具厂

手机:15233728688

联系人:薛经理

地址:保定市城东闫庄工业区

新闻动态
水泥标志桩模具原理
水泥标志桩模具利用铁板制作的非常多,这种生产方式是根据现在的环境需求和经济效益而定的。首先标志桩从它的使用环境来看,大多在户外使用,风吹日晒,这就要求它大使用寿命一定要长,受抗击能力必须强;其次,根据不同的性质来看,有各种不同的标志桩,像电力标志桩,燃气标志桩,电缆标志桩这种危险地带的预制件,要求更严格了,如果使用古老的木材标志桩,危险程度可想而知,而采用塑料材质的确不能达到它的实用性,所以水泥标志桩模具成为了新生力量。
The cement marker pile mold is made of iron plate, which is based on the current environmental needs and economic benefits. First of all, the marker pile is mostly used outdoors, wind and sun, which requires long service life and strong resistance. Secondly, according to different properties, there are various kinds of marker piles, such as electric power sign pile, gas mark pile, cable sign pile such dangerous zone. The preform is more stringent, if the use of ancient wood marker pile, the risk degree can be imagined, and the use of plastic material does not achieve its practicality, so the cement marker pile mold became a new force.
标志桩模具作为高速高铁上的标志性的水泥制品,对于标志桩模具来说,它所能展现的特主要在于水泥制品的制作工艺,对于这种模具来说,标志桩模具分为了标志桩钢模具跟标志桩塑料模具,每一种模具选材都有独特的设计,标志桩模具选用钢模具生产的比较多,钢模具根据客户的要求进行定做立模跟平模的设计为客户带去了方便。
As a landmark cement product on high speed and high speed iron, the mark pile die is mainly for the production process of the cement products for the mark pile mold. For this kind of mold, the mark pile die is divided into the marking piled steel mould and the marking pile plastic mould, and the material selection of each mold has a unique design. It is more convenient to choose steel mould for marking pile mould. The steel mould is customized according to the requirements of customers, and the design of vertical mould and flat die is convenient for customers.
一般在春秋和夏季来说,气温较高,标志桩钢模具混凝土中的水分蒸发的要快,所以,混凝土凝固的就快,一天可生产两模或三模;冬天气温较低,标志桩钢模具混凝土中的水分蒸发的慢,混凝土凝固就慢,每天只能生产一模。
General in the spring and autumn and summer, high temperatures, evaporation of water mark in concrete pile and steel mold to be fast, so the concrete solidification soon, one day can produce two or the third mock exam of low temperature; winter, mark water evaporation in concrete pile and steel die slow, concrete solidification is slow every day, only the production of the first mock exam.

联系方式

  1. 公司名称:保定永久标志桩模具厂
  2. 手机:15233728688
  3. 联系人:薛经理
  4. 地址:保定市城东闫庄工业区

版权 © 河北保定永久标志桩模具厂 网址:http://biaozhi.37ix.com.cn  推荐:标志桩模具,塑料标志桩模具,水泥标志桩模具

网站建设及优化保定遨游网络公司